CASE STUDIES
CASE STUDY 1
PROJECT: 64 MALDON ROAD
THIS PROJECT, FOR A PRIVATE CLIENT WAS A FULL INSTALLATION TO A NEW BUILD OFFICE OVER 2 FLOORS. WORKS INCLUDED LIGHTING, SMALL POWER, DADO TRUNKING, FLOOR BOXES, MECHANICAL PLANT SUPPLIES, ASHP, UFH, DISABLED FACILITIES, FIREALARM, INTRUDER ALARM AND AIR CONDITIONING. THE M&E INSTALLATION WAS MANAGED BY LSMEPS AND INCLUDED DESIGN WHILST IN CONSTANT CONTACT WITH THE END CLIENT. THE PROJECT RUN FOR APPROXIMATELY 8MONTHS, WITH LSMEPS LTD INSTALLING THE SITE TEMPORARY LIGHTING AND POWER PRIOR TO THE PROJECT COMMENCING.
STATUS: COMPLETE
CASE STUDY 2
PROJECT: ATHERTON PLACE - 3NR NEW BUILD HOUSES
LSMEPS LTD COMPLETED THIS PROJECT FOR ONE OF OUR COMMERCIAL BUILDERS. THE PROJECT CONSISTED OF 3 NEW BUILD HOUSES MANAGED BY HARROW COUNCIL. OUR INSTALLATIONS CONSISTED OF A FULL SITE SET UP INCLUDING 110V POWER, LIGHTING AND WATER SUPPLIES. THE HOUSES WERE A TYPICAL DOMESTIC INSTALLATION FOLLOWING OUR FULL M&E DESIGN SERVICE. THIS IS THE SECOND PROJECT THAT LSMEPS HAS CARRIED OUT UNDER HARROW COUNCIL WITH A FURTHER DEVELOPMENT IMMINENT.
STATUS: COMPLETE
CASE STUDY 3
PROJECT: NORTON ROAD - 8NR APARTMENTS
THE NORTON ROAD PROJECT COMMENCED FOLLOWING A FULL DISCONNECTION AND REMOVAL OF ALL EXISTING M&E SERVICES WITHIN THE BUILDING AND A TEMPORARY LIGTHING, POWER AND WATER SET UP. WITH THIS PROJECT BEING A FULL REFURB THE INTERNAL LAYOUT WAS FULLY RESTRUCTURED AND FOLLOWING OUR DESIGN THE M&E INSTALLATION WAS UNDERWAY. SERVICES INCLUDED GAS FIRED COMBI BOILERS, H&C AND HEATING INSTALLS, LIGHTING AND POWER TO EACH OF THE APARTMENTS. MAINS INSTALLATIONS, COMMUNAL LIGHTING, POWER AND HEATING, LIFT SUPPLIES, DATA NETWORKS, ADDRESSABLE FIRE ALARM AND OUTBUILDING FIT OUTS.
STATUS: COMPLETE